We changed the main bathroom slightly over a week ago but they have continued to frame it to the original plan. Oh well more work for them to remove what they have done. They have blocked the wrong wall for the television in the upstairs living room. There are some steel beams that still have not been bolted together. We found some soil erosion under the slab at the Alfresco corner and bricks that are overhanging the slab (allowance is 15mm under the Building Code of Australia).
Airconditioning Roughin crumbling away
Void under rear corner of slab due to soil erosion or shrinkage
Bricks overhanging slab
Front Eaves
Front Balcony Eaves
Side Eaves
Rear Balcony Eaves
Bricks Finished
Kitchen Stacker Window Removed for Bricking Work
Upstairs Linen
Stacker Doors sitting in muddy puddle in living room
Warped Stacker Door Frames
Mortar splashed in stacker door frames
Stacker doors sitting in living room
Untreated timber used for packing out eaves. Why?
Timber posts on front balcony
Stacking for tv on wrong wall. Should be opposite wall
Downstairs window sill
Upstairs Window Sill (spot the difference to the downstairs sill?)
Walk in robe Bed 2
Walk in robe bed 3